NEN 1010: inspection at commissioning and after conversion

StandardsReading time: 4 minutesUpdated: September 2026
Google rating: 5,0 out of 10 reviews★★★★★Rated by our clients

NEN 1010 governs how an installation must be built. An inspection under this standard therefore belongs to the moment something new has been made or changed, not to the periodic check afterwards.

Construction versus use

NEN 1010 is the construction standard: it describes what a safe low voltage installation must look like. NEN 3140 is the usage standard, covering safe work with an existing installation.

That is why you commission a NEN 1010 inspection for new build, an extension or a conversion, and Scope 8 or Scope 10 periodically thereafter.

When you need this inspection

These moments occur most often in practice.

  • Commissioning of a new commercial building or plant room
  • Extension of the installation, such as an extra board or a heavier connection
  • A conversion in which circuits were moved or added
  • Installation of an EV charging point or a machine with its own supply
  • A client or contractor asking for proof at handover

What is checked

A commissioning inspection consists of a visual check and a series of measurements: continuity of the protective conductor, insulation resistance, operation of the residual current device, prospective short circuit current and correct discrimination of the protective devices. The documentation is also checked: schematics, circuit schedules and the labelling present.

That last point in particular tends to produce findings. An installation can be technically sound while the drawings show the situation of two conversions ago.

Do it before everything is closed up

Schedule the inspection when the installation is finished but the finishing work has not yet concealed everything. If something does not comply, repair is then a matter of hours. Two weeks later, with everything closed and in use, the same issue becomes a project.

In practice this subject belongs with our Energy storage inspection en SCIOS Scope 8 inspection. There you can read how we work and what exactly is checked, or you can request a quote without obligation aan.

Further reading: what is NEN 3140?, what is NEN 1010?, the inspection plan explained.

Tip from the inspector

If you are unsure which inspection you need, send us the passage from your policy that mentions electrical work or inspection. We read those daily and can see within minutes what your situation requires.

Frequently asked questions

Is a NEN 1010 inspection mandatory for new build?

The Dutch building decree refers to NEN 1010 for construction. The inspection itself is usually required by the client, the contractor or your insurer, and is proof that the work was done to standard.

Who usually requests this inspection?

The client or the installer, but also owners who want certainty about the quality of the work before paying the final instalment.

Can I combine this with a Scope 8?

For an entirely new installation that would be duplicate work. For an extension of an existing installation we regularly combine them.

Prefer personal advice?

Call us or ask your question through the form. We are happy to think along about what your situation needs.

Get in touch Request a quote

Want your installation inspected by a SCIOS certified body?

Request a quote without obligation, or call us to discuss the scope of the inspection.

Request a quote More information
Make a request