"The list of defects they drew up was very clear and well organised, so our installer could get straight to work. It really felt as though they were thinking along with us."

For new and modified installations we carry out NEN 1010 inspections. This inspection belongs to the commissioning of a new or altered installation, whether that is new build or a conversion.
It gives you certainty of a safe and correct installation, fully in line with statutory requirements. You receive a clear report with which you can demonstrate that the installation was built to standard.
Read more about what a NEN 1010 inspection costs, what is measured at commissioning en inspecting charging points.






A tailored quote without obligation in a few clicks. You finish on the quote page, with everything already filled in.
"The list of defects they drew up was very clear and well organised, so our installer could get straight to work. It really felt as though they were thinking along with us."
"The Scope 10 inspection at our car rental company was carried out excellently. The report was clear and immediately usable. Our certificate arrived quickly and went straight to our insurer."
"Real craftsmanship. It is good to see how father and son work as a well-matched team. They are fully certified for Scope 8, 10 and 12, which gave us a lot of confidence about the fire safety of our installations."
"Expert, friendly and very punctual. The inspection was carried out skilfully and the explanation was clear. For a professional electrical inspection this is the place!"
"At last a report we can actually use. Very clear!"
Everything you want to know about the NEN 1010 inspection.
At commissioning of a new installation, when extending with an extra distribution board or a heavier connection, and after a conversion in which circuits were moved or added.
Only in so far as the extension affects it. A new heavy circuit can influence the discrimination of protective devices already in place; we take that into account.
As soon as the installation is finished but the finishing work has not concealed everything. A deviation is then repaired in hours rather than opened up afterwards.
That depends on the size of your location and the requirements of your insurer or working conditions law. We establish that in advance and you receive a clear quotation without obligation, so you know exactly where you stand beforehand.
No. We start with the visual check and the thermography while the installation is running. For a few mandatory measurements we arrange a brief switching window in consultation, so your operation is hindered as little as possible.
Yes, that is allowed, see also NEN 3140. A NEN 1010 inspection is separate from SCIOS: often it only concerns the new or modified part of the installation. Which part we inspect is agreed with you in advance.
We explain clearly what is wrong and help with any questions, so that the installation is approved again. You engage your own electrician independently.
After the inspection we process all findings into a clear report under NEN 1010, which you receive from us as soon as possible. A NEN 1010 inspection is separate from SCIOS, so there is no registration in the SCIOS portal.
Through the form on this page. Your request is ready in a few clicks. Calling is of course also fine: +31 6 250 78 497.
Request a quote without obligation, or call us to discuss the scope of the inspection.
Request a quote More information