More and more companies are installing an energy storage system: a battery that stores electricity to absorb peaks, to use self-generated solar power later, or to relieve the grid connection. Such a system brings risks of its own. A lithium battery that overheats or is wired incorrectly can cause a fire that is hard to extinguish, which is why insurers and local authorities increasingly set requirements for siting, protection and maintenance.
We assess the system as a whole: the battery itself, the inverter, the connection to your installation, the protective devices, the siting and the fire safety of the room. In doing so we look at PGS 37-1 for storage with lithium batteries and at NEN 1010 for the electrical connection. You receive a report with which you can demonstrate to your insurer and the local authority that your storage is installed and used safely.
Read more about the inspection of charging points and charging infrastructure, the NEN 1010 against which the connection is tested en what ends up in the report.






A tailored quote without obligation in a few clicks. You finish on the quote page, with everything already filled in.
"The list of defects they drew up was very clear and well organised, so our installer could get straight to work. It really felt as though they were thinking along with us."
"The Scope 10 inspection at our car rental company was carried out excellently. The report was clear and immediately usable. Our certificate arrived quickly and went straight to our insurer."
"Real craftsmanship. It is good to see how father and son work as a well-matched team. They are fully certified for Scope 8, 10 and 12, which gave us a lot of confidence about the fire safety of our installations."
"Expert, friendly and very punctual. The inspection was carried out skilfully and the explanation was clear. For a professional electrical inspection this is the place!"
"At last a report we can actually use. Very clear!"
Everything you want to know about the Energy storage inspection.
We are launching this inspection in December 2026. You can request it now: we will note your request and contact you as soon as we can schedule, so you are first in line.
No, this is a separate inspection. If you already have a Scope 10 or Scope 12 with us, we will coordinate the visits so that we come once.
Yes. Even a smaller storage system of a few kWh needs to be sited and connected properly. The size of your system does determine how long the inspection takes, so please state the capacity in kWh with your request.
That depends on the size of your location and the requirements of your insurer or working conditions law. We establish that in advance and you receive a clear quotation without obligation, so you know exactly where you stand beforehand.
No. We start with the visual check and the thermography while the installation is running. For a few mandatory measurements we arrange a brief switching window in consultation, so your operation is hindered as little as possible.
Yes. An energy storage inspection is separate from SCIOS. Together we decide what we assess, for example only the battery and its siting, or the connection to your installation as well. What we inspect is agreed in advance.
We explain clearly what is wrong and help with any questions, so that the installation is approved again. You engage your own electrician independently.
After the inspection we set out all findings and our advice in a clear report, which you receive from us as soon as possible. An energy storage inspection is separate from SCIOS, so there is no notification in the SCIOS portal.
Through the form on this page. Your request is ready in a few clicks. Calling is of course also fine: +31 6 250 78 497.
Request a quote without obligation, or call us to discuss the scope of the inspection.
Request a quote More information