ElektroNorm Inspecties & Services
Home About us
Our services
How we work
Preparation
Areas
Contact Request a quote

The inspection plan: what it contains and why you sign it

ProcessReading time: 4 minutesUpdated: September 2026
Google rating: 5,0 out of 10 reviews★★★★★Rated by our clients

Before we measure a single value, there is an inspection plan. Many clients see it as paperwork up front, but it is the document that determines whether your certificate holds up later.

What the plan states

The inspection plan records exactly what will be inspected and on what basis: which parts of the installation, which distribution boards, which scope, which standard, which inspection interval and any particulars applying to your situation.

It is therefore the scope of the assignment. If something is not in it, it has not been inspected, and that is not something you want to discover afterwards.

Exclusions are not permitted

This is the point we explain most often. Within the SCIOS system you may not exclude parts of the installation to make the inspection cheaper or faster. The entire installation is inspected, otherwise the certificate is not legally valid.

If you come across a provider offering to inspect only the main distribution board, be careful. It produces a report that is worth little when a claim is made.

Why you sign it

With your signature, or your approval by email, you confirm that the scope is correct and that you agree with the starting points. That is a requirement within our certification, and it prevents discussion afterwards about what was and was not covered.

At the same time we settle practical matters: access to all rooms, who is present on site, and when the installation is representatively loaded for the thermography.

What you can supply

The plan is better and the inspection faster if you supply a few things in advance.

  • The installation schematics, even if they are not fully up to date
  • The previous inspection report, if there is one
  • The policy clause with your insurer's requirements
  • An overview of the rooms containing distribution boards
  • Who holds the keys to locked plant rooms

In practice this subject belongs with our SCIOS Scope 12 inspection en NEN 3140 inspection. There you can read how we work and what exactly is checked, or you can request a quote without obligation aan.

Further reading: NEN 3140 for an owners association, electrical safety and Dutch working conditions law, how to prepare your premises.

Tip from the inspector

If you are unsure which inspection you need, send us the passage from your policy that mentions electrical work or inspection. We read those daily and can see within minutes what your situation requires.

Frequently asked questions

May I exclude rooms or sections?

No. Exclusions are not permitted under the SCIOS rules; the complete installation is inspected for a legally valid certificate.

Does the inspection plan cost extra?

Not with us, it is part of the assignment. When comparing quotations, check whether the other party includes it.

What if there turns out to be more than planned?

We discuss it with you on the spot. Usually it fits within the planned time; if it is substantially more, you first receive an addition to the quotation.

Prefer personal advice?

Call us or ask your question through the form. We are happy to think along about what your situation needs.

Get in touch Request a quote

Want your installation inspected by a SCIOS certified body?

Request a quote without obligation, or call us to discuss the scope of the inspection.

Request a quote More information
Make a request