How many years between inspections? Rarely a fixed number. The interval depends on how heavily your installation is loaded, the environment it sits in and what your insurer has written down. Here is how to determine the right frequency.
NEN 3140 does not prescribe a fixed number of years. It provides a method: you determine the inspection interval based on risk factors such as the age of the installation, the environment, the competence of the users and how intensively it is used.
In practice that often works out at five years for an ordinary office building, and three years or less for a workshop, production environment or outdoor installation. A board in a damp or dusty environment simply deteriorates faster than one in a clean plant room.
Where the standard leaves room, the policy is concrete. For a Scope 10 inspection five years is the most common interval, but three years also occurs, certainly for buildings with elevated fire risk or a PV installation on the roof.
If your policy names an interval, that one is leading. It is the only interval that can cost you your cover if you let it lapse.
As a rule of thumb we apply these intervals, unless your insurer requires otherwise.
A great deal changes between two inspections. A machine is added, a circuit is loaded more heavily, someone hangs a distribution block off it. A separate thermographic check halfway through the interval is relatively cheap and catches exactly those creeping problems.
On request we plan that in the same rhythm as your main inspection, so you no longer have to think about it.
In practice this subject belongs with our NEN 3140 inspection en NEN 1010 inspection. There you can read how we work and what exactly is checked, or you can request a quote without obligation aan.
Further reading: SCIOS Scope 8 inspection in Utrecht, SCIOS Scope 10 inspection in Duiven, SCIOS Scope 10 inspection in Arnhem.
If you are unsure which inspection you need, send us the passage from your policy that mentions electrical work or inspection. We read those daily and can see within minutes what your situation requires.
No, that is a common misconception. Five years is customary for a normally loaded building, but NEN 3140 asks you to determine the interval from risk factors. Your policy may require a shorter one.
For the modified part, yes. New or altered installations require a NEN 1010 inspection at commissioning. The periodic inspection of the rest continues as normal.
Then you are not demonstrably compliant at that moment. Contact us and we will usually schedule the inspection within a few weeks.
Call us or ask your question through the form. We are happy to think along about what your situation needs.
Get in touch Request a quoteRequest a quote without obligation, or call us to discuss the scope of the inspection.
Request a quote More information